These values must be set for the TDA.
|
Number of subintervals |
The number of subintervals on the detail time axis. The subintervals following the first time subinterval are generated in log scale. This parameter has an impact on the accuracy of solution of concrete creep. See also Time axis. |
|
Ambient moisture |
Ambient moisture in percentages. |
Each member has it’s own history of in local time axis containing e.g. time of casting, end of curing, etc. All data set in the setup dialog are related to local time axis of relevant 1D member. The origin of the local time axis (zero time) is set to the time, when the appropriate stiffness of macro is introduced (added) into global stiffness matrix of the whole structure ("birth of member"). The relevant member in highlighted in a special colour in the drawing in main graphic window. The origin of local time axis is then located to global time of current construction stage.
Open the service Construction stages.
Start function Setup.
Input the required parameters.
Confirm with [OK].
Close the Setup dialogue.
Note: The TDA part of the setup dialogue is available ONLY if TDA module is available, i.e. if e.g. the project is of Frame XZ type.