For better convergence of soilin iterations for foundation at great depth user can set at solver setup in group Soilin - Thickness of loose layer at contact level [m]. The recommended value is 0,500 m. More info in Required parameters for Soil-in calculation.
The nearest subsoil around the loaded structure is also affected by its settlement. The better realistic picture how it works in the reality is displayed below.
Calculation of the nearest surrounding of the structure is a specific use case. It is recommended to add one more plate to the structure for this purpose – additional subsoil element.
The new plate should be inserted with the minimum thickness (e.g. 0,01mm) and placed next to the foundation.
The C parameters for this affected subsoil around the structure are calculated this way also.
The deformed subsoil calculated by the SCIA Engineer:
Calculated C parameters:
The structure is marked by the black rectangle and around this is one more plate - surrounding plate – with thickness 0,001mm.
When user don’t use any subsoil elements then the program will eliminate the neglect of the subsoil on edges by an automatic inserting of vertical supports on the foundation edges.
The calculation of those supports is based on already known C parameters. The program try to support the plate in the same way as it should be supported by the subsoil itself. This leads to approximate model where the sum of reaction is contact stress with reactions in those nodes.
This solution can be sometimes undesirable – e.g. if there is a second foundation near by the calculated one or there is some other support under or near the foundation edge.
This automatic input can be avoided manually. User can insert a spring with a small stiffness on the plate edges and then the system won’t use automatic input of vertical supports. This could be the additional subsoil elements.
The pad foundation is not connected with the soil-in calculation.
How to use soil-in for the pad foundation check:
Calculated C parameters on the surrounding plate –> C parameters for the pad foundation
Sometimes the model is correct but some circumstances may cause unfinished iterative process. The results in cycles don’t lead to one set of C parameters but on the contrary, the results are more and more different.
This can be caused by some tensions in the foundation plate, specific foundation members and similar problems.
How to solve those problems:
When the plate is not in compression, then soilin cannot be calculated properly.
There could be a message about wrong total resultant:
This may happen when loads are from the bottom to the top, or when there is some change in local LCS of the plate.
This may happen when additional subsoil elements are not added around the structure.
Also when the soilin didn’t find the correct result and calculation is stopped too soon. (For example when solver setup defines only few soilin cycles.)
The main subsoil surface is created automatically when a structure and a borehole is inserted to the project. The size of the subsoil outline is calculated from the structure size, positions of boreholes and some offset around.
The geological fault is created when the second area is inserted to the main one.